PPAP/Multipurpose Terminal UM2

PPAP/Multipurpose Terminal UM2

ព័ត៌មានទូទៅ

In order to improve stevedoring operation of Subfeeder Multipurpose Terminal UM2 to be more effective, productive and attracting customers to use Subfeeder Multipurpose Terminal UM2, this Terminal must improve and develop more due to it is located next to Kompongcham and Tboung Kmom boarder which have the connection between the northern and northeast side province of Cambodia that is the necessary areas of agriculture and agro-insdustry from the south downtown to Vietnam country.
Sub-Feeder Multipurpose Terminal UM2 play an important role in order to gathering the inland waterway trainsportation and cargo trading. Curently, PPAP completed the construction of a 12-meters by 46.9-meters wharlf and is continuing to develop the Phase 1 of infrastructure and plans to implement the Phase 2 in 2023.

លេខទំនាក់ទំនង

PPAP/Multipurpose Terminal UM2

Tonle Bet Terminal UM2
Phone: 010 444 571 (Chhiev Songkang)
Address: Tonle Bet Village, Tonle Bet Commune, Thbong Khmoum District, Thbong Khmoum Province, Cambodia.
Email: ppapmpwt@online.com.kh

WEBSITE: http://www.ppap.com.kh

Infrastructure and Equipment

PPAP/Multipurpose Terminal UM2

Address

Doun Mau Leu Village, Tonle Bet commune, Thbong Khmom district, Thbong Khmom province.

Terminal location

Located at the left bank of the Mekong River and 103km upstream from the intersection of the Chaktomuk River (11º57’47.73”N and 105º28’33.13″E).

Berth

1 (pontoon; 6m x 28m)
1 (5,000 DWT)

Anchorage

Between 6m to 20m in depth, anchorage is available at 11°58’43.41″N and 105°28’9.58″E (mud and sand bottom, strong current during the
rainy season)..

Permitted drafts

Varies from the minimum level of 4.5m in March to the maximum level of 5.5m in September (draft for a vessel proceeding to UM2 depends on
being able to cross the bar at Cua Tieu).

Channel depth

Draft of 4.5m during the dry season; subject to regular maintenance from the intersection of the Chaktomuk River to Kampong Cham via the
Sdao Channel (3.5km long and 60m wide)

Hours of Operation

7days/24hrs

Handling equipment

Mobile crane, Pontoon

Latest updates

Capacity build training

Attend capacity building on port administration supported by JICA.

26 September 2023

Join field activies GDWMTP/DWIPC and PPAP

Join activies for field inspection buoys along Tonle Sap River.

August 2023