PPAP/Multipurpose Terminal (TS3)
ព័ត៌មានទូទៅ
Multipurpose Terminal (TS3) was PPAP’s main port for general container cargoes and for tourism. Due to TS3 Terminal’s limited capacity to accommodate the continual growth of container traffic, PPAP has invested in developing a new container terminal (LM17). Since the completion of LM17, TS3 has been converted into a multipurpose terminal. While it mainly handles general cargoes, it also serves as a passenger terminal. Curently, PPAP has been preparing to transform this port into an international passenger and tourist port, with the construction of a waiting hall and a tourist station (Tourist Hall), which is scheduled to be completed in April 2023.
លេខទំនាក់ទំនង
PPAP/Multipurpose Terminal (TS3)
Multipurpose Terminal TS3
Phone: 010 444 589 (Hei Song)
Phone: (+855) 23 427 802
Fax: (+855) 23 427 802
Email: ppapmpwt@online.com.kh
WEBSITE: http://www.ppap.com.kh
Infrastructure and Equipment
PPAP/Multipurpose Terminal (TS3)
Address
#649, Preah Sisowath Street, Sangkat Sras Chork, Khan Daun Penh,
Phnom Penh.
Terminal location
Located at the right bank of Tonle Sap, 3.2km from the intersection of the Chaktomuk River (11°34’59.68″N and 104°55’17.41″E).
Berth
3 (5,000 DWT)
Anchorage
Between 5m and 15m in depth, anchorage is available at 11°33’46.98″N and 104°56’34.57″E, in front of the terminal in the Tonle Sap River and also in the Chaktomuk quarter area (mud and sand bottom, strong current during the rainy season).
Permitted drafts
Varies from the minimum level of 4.5m in March to the maximum level of 5.5m in September (draft for a vessel proceeding to TS3 depends on being able to cross the bar at Cua Tieu).
Hours of Operation
7days/24hrs
Handling equipment
Fork-Lift
Latest updates

Capacity build training
Attend capacity building on port administration supported by JICA.
26 September 2023

Join field activies GDWMTP/DWIPC and PPAP
Join activies for field inspection buoys along Tonle Sap River.
August 2023